## Project snapshot
Province: Lao Cai, Northern Vietnam
Total area (Phase 1): 255 ha
Operational time: 2024–2074
Land structure shown in the master plan: industrial land blocks, service and infrastructure land, and a housing area

## Connectivity references
Road travel time references
Hanoi: 1 hour 40 minutes
Noi Bai Airport: 1 hour 30 minutes
Lao Cai border gate: 2 hours 10 minutes
Hai Phong Port: 3 hours 30 minutes
Positioning statements
Gateway corridor connecting Vietnam and China
Direct access to the Chinese market via the Lao Cai border gate corridor
## High-speed rail pipeline stated
High-speed railway project positioning (Lao Cai–Hanoi–Hai Phong)
Expected start of construction: 12/2025
Completion time: 2030
Total length: 419 km
Design speed: up to 160 km/h
Payload: 22.5 tons/axle
Positioned as linking to China’s railway network at the Lao Cai border gate and connecting to seaports via Hai Phong and Quang Ninh rail links

## Technical infrastructure capacities
Power
National grid supply via 110/22 kV transformer station
Capacity: 2x63 MVA
Water
Water station capacity: 15,000 m³/day and night
Wastewater and drainage
Wastewater treatment plant capacity: 8,300 m³/day and night
Rainwater drainage system constructed separately from wastewater drainage
Internal traffic
Grid layout transportation network
Minimum carriageway width: 10.5 m
Sidewalks: 8–10 m
Firefighting
Firefighting water system along road lines
Fireplug spacing: 120–150 m
Telecommunications
Modern telecommunications system stated to meet international standards
Green environment
Green trees cover: 12.5% of total land area
## Social infrastructure and services stated
IP security: security guards stated inside the industrial park
Customs reference: 8 km
Hospital reference: 5 km
Surrounding area positioning includes emerging urban areas and residential options for experts and workers
## Investment incentive scope stated
Import-duty incentive scope presented under Decree 134/2016/ND-CP, including exemption categories for eligible cases such as:
Imported goods for the production of exported goods
Imported goods for processing and processed export products
Goods imported to create fixed assets for entities eligible for investment incentives
Imported goods for scientific research and technology development
Imported goods for environmental protection
Raw materials, supplies, and components imported directly for production of IT products, digital content, and software
5-year duty exemption scope for certain raw materials, supplies, and components not domestically manufactured, in qualifying cases from the commencement date of production
## Service charges and planning parameters stated
Industrial service and maintenance
Industrial service and infrastructure maintenance fee: 0.7 USD/m²/year (yearly payment)
Infrastructure rental: depends on location and land plot area
Land rental: stipulated by provincial authority decision
Power tariff references
Normal hours: 1,833 VND/kWh
Night hours: 1,190 VND/kWh
Rush hours: 3,398 VND/kWh
## Construction management parameters stated
Building density: 70%
Land using factor: 3.5 times
Height limit: 5 levels
Green density: over 20%
Setbacks: at least 6 m from internal road boundary and at least 3.5 m from neighboring plot boundary
Fence along internal roads: transparent fence
Permitted buildings: production plants, warehouses, operating offices, canteens, and support facilities
Prohibited: housing buildings, underground exploitation buildings
## Workforce and statutory cost references stated
Minimum wage (Region 3): 4,140,000 VND/person/month (159 USD/person/month)
Total social insurance: 32%
Employer contribution: 21.5%
Employee contribution: 10.5%
Applied timeline stated: from January 1, 2026 under the cited decree
## Investment procedure stated (step flow)
Sign principle agreement for land sublease
Apply for Investment Registration Certificate
Apply for Enterprise Registration Certificate, tax code, and seal
Sign official land sublease and handover
Agree connection points (water, wastewater, electricity, gate location)
Submit construction designs for approval (basic design stage)
Submit fire prevention and fighting plan for approval
Submit environmental impact assessment for approval
Apply for construction permit
Construct factory and install machinery
Register land use rights certificate (independent step)
## Call to action
Click here or Scan the QR Code to request the full project brief, land plot matching, and site visit arrangement.
## For industrial park developers
Feature your project on Manufacturing.com.vn with a data-first public article and a controlled lead handover flow. Click here or Scan the QR Code to submit your project profile.

## For industrial park developers
Feature your project on Manufacturing.com.vn with a data-first public article and a controlled lead handover flow. Click here or Scan the QR Code to submit your project profile.