Industrial Land

[Lao Cai] 255-ha Industrial Land on the China Gateway Corridor with 8,300 m³/day Wastewater Capacity

Friday, 16 Jan, 2026

## Project snapshot

  • Province: Lao Cai, Northern Vietnam

  • Total area (Phase 1): 255 ha

  • Operational time: 2024–2074

  • Land structure shown in the master plan: industrial land blocks, service and infrastructure land, and a housing area

STRATEGIC TRADE LOCATION Gateway connectig Vietnam & China
STRATEGIC TRADE LOCATION
Gateway connectig Vietnam & China

## Connectivity references
Road travel time references

  • Hanoi: 1 hour 40 minutes

  • Noi Bai Airport: 1 hour 30 minutes

  • Lao Cai border gate: 2 hours 10 minutes

  • Hai Phong Port: 3 hours 30 minutes

Positioning statements

  • Gateway corridor connecting Vietnam and China

  • Direct access to the Chinese market via the Lao Cai border gate corridor

## High-speed rail pipeline stated
High-speed railway project positioning (Lao Cai–Hanoi–Hai Phong)

  • Expected start of construction: 12/2025

  • Completion time: 2030

  • Total length: 419 km

  • Design speed: up to 160 km/h

  • Payload: 22.5 tons/axle

  • Positioned as linking to China’s railway network at the Lao Cai border gate and connecting to seaports via Hai Phong and Quang Ninh rail links

INDUSTRIAL PARK MASTER PLAN
INDUSTRIAL PARK MASTER PLAN

## Technical infrastructure capacities

Power

  • National grid supply via 110/22 kV transformer station

  • Capacity: 2x63 MVA

Water

  • Water station capacity: 15,000 m³/day and night

Wastewater and drainage

  • Wastewater treatment plant capacity: 8,300 m³/day and night

  • Rainwater drainage system constructed separately from wastewater drainage

Internal traffic

  • Grid layout transportation network

  • Minimum carriageway width: 10.5 m

  • Sidewalks: 8–10 m

Firefighting

  • Firefighting water system along road lines

  • Fireplug spacing: 120–150 m

Telecommunications

  • Modern telecommunications system stated to meet international standards

Green environment

  • Green trees cover: 12.5% of total land area

## Social infrastructure and services stated

  • IP security: security guards stated inside the industrial park

  • Customs reference: 8 km

  • Hospital reference: 5 km

  • Surrounding area positioning includes emerging urban areas and residential options for experts and workers

## Investment incentive scope stated
Import-duty incentive scope presented under Decree 134/2016/ND-CP, including exemption categories for eligible cases such as:

  • Imported goods for the production of exported goods

  • Imported goods for processing and processed export products

  • Goods imported to create fixed assets for entities eligible for investment incentives

  • Imported goods for scientific research and technology development

  • Imported goods for environmental protection

  • Raw materials, supplies, and components imported directly for production of IT products, digital content, and software

  • 5-year duty exemption scope for certain raw materials, supplies, and components not domestically manufactured, in qualifying cases from the commencement date of production

## Service charges and planning parameters stated

Industrial service and maintenance

  • Industrial service and infrastructure maintenance fee: 0.7 USD/m²/year (yearly payment)

  • Infrastructure rental: depends on location and land plot area

  • Land rental: stipulated by provincial authority decision

Power tariff references

  • Normal hours: 1,833 VND/kWh

  • Night hours: 1,190 VND/kWh

  • Rush hours: 3,398 VND/kWh

## Construction management parameters stated

  • Building density: 70%

  • Land using factor: 3.5 times

  • Height limit: 5 levels

  • Green density: over 20%

  • Setbacks: at least 6 m from internal road boundary and at least 3.5 m from neighboring plot boundary

  • Fence along internal roads: transparent fence

  • Permitted buildings: production plants, warehouses, operating offices, canteens, and support facilities

  • Prohibited: housing buildings, underground exploitation buildings

## Workforce and statutory cost references stated

  • Minimum wage (Region 3): 4,140,000 VND/person/month (159 USD/person/month)

  • Total social insurance: 32%

    • Employer contribution: 21.5%

    • Employee contribution: 10.5%

  • Applied timeline stated: from January 1, 2026 under the cited decree

## Investment procedure stated (step flow)

  • Sign principle agreement for land sublease

  • Apply for Investment Registration Certificate

  • Apply for Enterprise Registration Certificate, tax code, and seal

  • Sign official land sublease and handover

  • Agree connection points (water, wastewater, electricity, gate location)

  • Submit construction designs for approval (basic design stage)

  • Submit fire prevention and fighting plan for approval

  • Submit environmental impact assessment for approval

  • Apply for construction permit

  • Construct factory and install machinery

  • Register land use rights certificate (independent step)

## Call to action
Click here or Scan the QR Code to request the full project brief, land plot matching, and site visit arrangement.

## For industrial park developers
Feature your project on Manufacturing.com.vn with a data-first public article and a controlled lead handover flow. Click here or Scan the QR Code to submit your project profile.


Click here or Scan the QR Code to request the full project brief, land plot matching, and site visit arrangement.

## For industrial park developers
Feature your project on Manufacturing.com.vn with a data-first public article and a controlled lead handover flow. Click here or Scan the QR Code to submit your project profile.

 

Tell us your needs