Industrial Land

[Bac Ninh] 300-ha Industrial Land with 45 MVA Power and 15,000 m³/day Wastewater Capacity

Friday, 16 Jan, 2026

## Project snapshot

  • Province: Bac Ninh, Northern Vietnam
  • Total master plan scale: 375.97 ha
    • Industrial zone: 300.04 ha
    • Urban/service zone supporting the industrial zone: 75.93 ha
  • Construction start stated: 09/2018
  • Leasing model: industrial land sublease with infrastructure
  • Minimum lease area: 2 ha

## Location and connectivity references

  • Within the Hanoi–Hai Phong–Quang Ninh growth triangle
  • Bac Ninh city center: 17 km
  • Hai Phong seaport: 85 km, around 1 hour 23 minutes
  • Noi Bai International Airport: 48 km, around 1 hour 15 minutes
  • Cat Bi International Airport: 97 km, around 1 hour 50 minutes
  • Rail reference: Hanoi–Quang Ninh rail corridor via Bac Ninh, length reference 132 km, speed reference 120 km/h
  • Waterway references: regional rivers supporting transport linkages

## Scale and land structure

  • Industrial land: 300.04 ha
  • Supporting urban/service land: 75.93 ha
  • Land use term stated: aligned with project operating term under Vietnamese investment regulations, not exceeding 50 years

## Internal traffic and on-site layout

  • Main internal road: 37 m width, 6 lanes
  • Sidewalks: 6 m
  • Street lighting installed
  • Underground installation along road corridors: power, water, and information systems

## Power, water, and wastewater capacities
Power

  • National grid supply: 110/22 kV
  • Capacity: 45 MVA

Water

  • On-site clean water plant: 20,000 m³/day-night

Wastewater and drainage

  • Separate rainwater and wastewater systems
  • Wastewater treatment plant: 15,000 m³/day-night

Telecom and internet

  • Information and internet system stated to meet international standards for domestic and international services

Fire-fighting

  • Fire-fighting water system along main and branch roads
  • Hydrant spacing: every 150 m
  • Hydrant diameter: D150 mm

Green coverage

  • Green and water-surface ratio stated: 13.29% of the industrial zone

## Services and support ecosystem stated

  • On-site industrial zone security team
  • Banking references: Vietcombank, BIDV, VietinBank, and other banks planned to open transaction offices
  • Worker housing planning: social housing and affordable housing land planned within the supporting urban zone
  • Local education pipeline references: universities, high schools, vocational education centers with graduate output figures stated

## Commercial terms and published charges
Land and fees

  • Minimum lease area: 2 ha
  • Industrial land sublease price (with infrastructure): 125 USD/m²
  • Industrial zone management and maintenance fee: 18,500 VND/m²/year
  • One-time connection fees (water, wastewater, electricity): 150,000,000 VND

Utilities

  • Electricity: per provincial power company tariff
  • Water: 15,000 VND/m³
  • Wastewater treatment: around 17,000 VND/m³
    • Wastewater volume calculation: 80% of water input

Telecom

  • Phone installation reference: around 460,000 VND per line
  • Broadband reference: 126,000 VND/month, installation fee stated as free

## Investment incentives stated
Import and export tax

  • Import duty exemption scope referenced under Decree 134/2016 for eligible fixed-asset imports, certain specialized transport in technology lines, and construction materials not produced domestically
  • Exemption references for processing and export production models
  • 5-year import duty exemption scope referenced for certain raw materials, supplies, components not domestically produced, under qualifying conditions

Profit remittance

  • Overseas profit remittance tax: stated as 100% exempt

VAT

  • Export VAT 0% under qualifying processing and export contract structures, with referenced legal basis

Corporate income tax

  • Standard CIT rate stated: 20%
  • Industrial zone new project incentive: up to 2 years exemption and up to 4 years 50% reduction
  • High-tech and software projects: 10% for 15 years with exemption and reduction periods; extension case referenced with maximum duration cap stated

## Construction management parameters stated
Permitted

  • Production workshops, warehouses, offices, canteens, and supporting infrastructure (parking, guard house, transformer station, fire system station)

Prohibited

  • Housing buildings inside enterprise plots
  • Underground water exploitation structures

Key parameters

  • Maximum building density: 60%
  • Land use factor: 2
  • Building setbacks:
    • 6 m for factory and service buildings
    • 10 m along a specified internal road corridor
    • At least 4.5 m from adjacent enterprise boundary for fire access
  • Green area requirement: at least 20%
  • Fence requirement along national road frontage: simple steel structure with ventilation

## Workforce references
Regional labor pool references

  • Population of 5 surrounding districts: 803,640 people
  • Working-age population reference: 410,000 people
  • Average age reference: 27

Wage references

  • Minimum basic wage for foreign-invested enterprises: 3,710,000 VND/month
  • Unskilled worker income: 3,800,000–5,300,000 VND/month
  • Engineers, technicians, office staff: 6,000,000–10,000,000 VND/month
  • Managers: 12,000,000–17,000,000 VND/month
  • Director: 1,000–1,500 USD/month

Social insurance

  • Total: 32%
    • Employer: 21.5%
    • Employee: 10.5%
  • Trade union fee reference: 2% (employer side)


Scan the QR Code to request the full project brief, plot matching, and a site visit arrangement.

## For industrial park developers
Scan the QR Code to submit your project profile.

Tell us your needs