
Province: Phu Tho, Northern Vietnam
Direct adjacency: Ho Chi Minh Road and Noi Bai–Lao Cai Highway
Regional linkage shown to major transport nodes and cross-border corridors
Total scale: 356 hectares
Operational time: 50 years (2014–2064)
Sublease industrial land with infrastructure (investor builds factory)
Sublease available workshops (ready-built factory option)
Lease apartments for workers
Manufacturing of consumer goods, foodstuff, medicine
Light industry
Manufacturing of electric equipment, assembly
Manufacturing of mechanic for car, motorbike
Manufacturing of construction materials
Warehouse, IDC

Noi Bai Airport: 60 km
Cat Bi Airport: 180 km
Hai Phong Port: 198 km
Cai Lan Port: 232 km
Lao Cai border gate: 210 km
The map also highlights highway access and planned/expected rail connectivity directionally
Internal traffic
Internal routes planned in a square pattern to facilitate access into building areas
Power
National grid supply via 110/22 kV transformer station
Capacity: 63 MVA
22 kV distribution line planned along internal roads
Water
Supplied by provincial water plant
Water pipe diameter: D110–D350 mm
Drainage
Separate rainwater and wastewater drainage systems
Rainwater drainage pipe diameter: D600–D1,250 mm (automatic drainage principle)
Wastewater and solid waste
Wastewater treatment total capacity: 7,500 m3/day
Wastewater pipe diameter: D300–D500 mm
Solid waste categorized, collected, and treated under provincial regulations
Telecom / internet
Telecom system positioned to international standard
Designed for high-speed data transfer and internal/external post office service
Green coverage
Green trees cover 12.6 percent of total land area
Prices and recurring charges (published benchmarks)
Infrastructure and service
Industrial service and infrastructure maintenance fee: 0.7 USD/m2/year (yearly payment)
Infrastructure rental and minimum sublease size: depend on actual plot
Land rental: stipulated by provincial authority decisions
Utilities
Water price: 11,429 VND/m3 (monthly payment)
Wastewater treatment fee: 9,547 VND/m3 (monthly payment), quantity benchmarked at 80 percent of water supply
Electricity tariff levels listed by time bands:
Normal hours: 1,833 VND/kWh
Night hours: 1,190 VND/kWh
Rush hours: 3,398 VND/kWh
Permitted buildings: production plants, warehouses, operating offices, canteens, support facilities (parking, guard house, transformer station, firefighting water tank)
Prohibited buildings: housing buildings, underground exploitation buildings
Setbacks: at least 5 m from internal road boundary; at least 3.5 m from neighboring plots (fire access)
Building density: 70 percent
Land use factor: 3.5
Height limit: 5 levels
Green density: 20 percent
Fence requirement: open fence (iron flower shape) on internal road side
Customs office located in the province
Hospital access: regional general hospital 6 km; provincial general hospital 25 km
Worker accommodation: dormitories adjacent to the industrial park with synchronous construction plan
Workforce and statutory cost references
Worker minimum: 4,140,000 VND/month
Average worker salary range: 230–390 USD/person/month
Engineer/technician/office staff: 350–650 USD/month
Manager range: 700–1,000 USD/month
Total social insurance stated at 32 percent, with employer and employee contribution breakdown provided
Click here or Scan the QR Code to request the full project brief, plot matching, and a site visit arrangement.

For industrial park developers
If you want your project featured on Manufacturing.com.vn in the same data-first format, submit your project profile for review.