Province: Bac Ninh, Northern Vietnam
Total area: 250 ha
Operational time: 2021–2071
Available land for lease: 100 ha

Road travel time references
Hanoi: 35 minutes
Noi Bai Airport: 45 minutes
Hai Phong Port: 1 hour 30 minutes
An airport located 6 km from the site: 8 minutes
Key road and corridor references shown
Close to National Roads No. 17 and No. 38
Adjacent to Ring Road No. 4 and a Hanoi–Gia Binh Boulevard
Positioned within the Hanoi–Hai Phong–Quang Ninh development triangle

Ring Road No. 4: planned completion in 2027
Hanoi–Gia Binh Boulevard: planned completion in 2026
Hanoi–Quang Ninh high-speed railway: planned completion before 2028
High-speed railway station planning is indicated in the surrounding area
Initial operation: end-2026
Total area: 1,959 ha
ICAO standard: 4F
Capacity targets by 2050: 50 million passengers and 2.5 million tons of cargo per year
Master plan shows dedicated zones for industrial land, technical infrastructure, and associated housing and urban areas
Parking area stated at 29,800 m2, designed for about 744 buses to serve the stated worker transportation needs
Intelligent Operations Center (IOC) described for integrated management of utilities and systems
Power supply, water supply, wastewater treatment
Surveillance cameras and smart camera system with AI functions
Environmental monitoring and lighting control
Integration with BIM model
On-site One-Stop Service Center described to coordinate investment procedures with local authorities and handle investor support through a portal
Power
National grid supply via 110/22 kV transformer station
Total capacity: 2 x 63 MVA
Water
Water station capacity: 15,000 m3/day and night
Pipeline system: D110–D400 mm
Water source stated: Duong River
Wastewater and drainage
Wastewater treatment station: 9,000 m3/day and night
Wastewater drainage pipe diameter: D300–D400 mm
Separate rainwater drainage system
Underground rainwater pipes: D300–D800 mm
Drainage principle stated: automatic drainage
Internal traffic
Grid layout transportation network
Minimum carriageway width: 10.5 m
Sidewalks: 6–10 m
Fire-fighting
Fire-fighting water system along road lines
Fireplug spacing: 120–150 m
Fire-fighting pillar diameter: D125 mm
Telecommunications
Modern telecommunications system stated to meet international standards
Domestic and international communication services positioning
Green trees cover: 11.15% of total land area
Trees described with a 60% “high-carbon sequestering” figure
CO2 absorption figure stated: at least 2,250 tons from the 3rd year onward
Solar power: expected minimum capacity around 1.5 MW
EV charging stations stated
Wastewater reuse stated at 5–25% with recirculating and irrigation reuse descriptions
Import-duty incentive scope is presented under Decree No. 134/2016/ND-CP, including listed exemption categories for eligible cases such as:
Imported goods for the production of exported goods
Imported goods for processing and processed export products
Goods imported to create fixed assets for entities eligible for investment incentives
Goods imported for scientific research and technology development
Imported goods for environmental protection
Raw materials, supplies, and components for IT products, digital content, and software
A 5-year duty exemption scope for certain raw materials, supplies, and components not domestically manufactured, subject to stated eligibility conditions
Infrastructure rental: 0.9 USD/m²/year, yearly payment
Water price: 13,210 VND/m3, monthly payment
Wastewater treatment fee: 9,600 VND/m3, monthly payment
Quantity defined as 80% of water supply
Power charges by time bands
Normal hours: 1,833 VND/kWh
Night hours: 1,190 VND/kWh
Rush hours: 3,398 VND/kWh
Building density: 70%
Land using factor: 3.5 times
Limited height: 5 levels
Green density: over 20%
Building setback from internal roads: 6–10 m
Minimum distance between adjacent enterprises’ fences: 3.5 m
Transparent fence required along internal roads
Permitted buildings: production plant, warehouses, operating offices, canteens, support facilities
Prohibited: house building, underground exploitation building
Minimum wage region 2: 4,730,000 VND/month
Average salary of workers: 320–500 USD/person/month
Engineer/technician/office staff: 430–680 USD/month
Chief division/chief accountant/manager: 680–1,100 USD/month
Director: 1,000–3,500 USD/month
Total social insurance: 32% with employer and employee contribution breakdown stated