Industrial Land

[Bac Ninh] 250-ha Eco-Smart Industrial Park with 100 ha Available and 9,000 m3/day Wastewater Capacity

Friday, 16 Jan, 2026

Project snapshot

  • Province: Bac Ninh, Northern Vietnam

  • Total area: 250 ha

  • Operational time: 2021–2071

  • Available land for lease: 100 ha

a top strategic locatin in the Bac Ninh region, equipped with comprehensive infrastructure that facilitates quick connectins to the capital, internatinal airports, seaports, and key industrial centers.
A top strategic locatin in the Bac Ninh region, equipped with comprehensive infrastructure that facilitates quick connectins to the capital, internatinal airports, seaports, and key industrial centers.

Connectivity references

Road travel time references

  • Hanoi: 35 minutes

  • Noi Bai Airport: 45 minutes

  • Hai Phong Port: 1 hour 30 minutes

  • An airport located 6 km from the site: 8 minutes

Key road and corridor references shown

  • Close to National Roads No. 17 and No. 38

  • Adjacent to Ring Road No. 4 and a Hanoi–Gia Binh Boulevard

  • Positioned within the Hanoi–Hai Phong–Quang Ninh development triangle

The park directly benefits from the internatinal air logistis network
The park directly benefits from the internatinal air logistis network

Regional infrastructure pipeline stated

  • Ring Road No. 4: planned completion in 2027

  • Hanoi–Gia Binh Boulevard: planned completion in 2026

  • Hanoi–Quang Ninh high-speed railway: planned completion before 2028

  • High-speed railway station planning is indicated in the surrounding area

Airport development parameters stated

  • Initial operation: end-2026

  • Total area: 1,959 ha

  • ICAO standard: 4F

  • Capacity targets by 2050: 50 million passengers and 2.5 million tons of cargo per year

Land structure and on-site planning

  • Master plan shows dedicated zones for industrial land, technical infrastructure, and associated housing and urban areas

  • Parking area stated at 29,800 m2, designed for about 744 buses to serve the stated worker transportation needs

Eco-smart systems and operations model

  • Intelligent Operations Center (IOC) described for integrated management of utilities and systems

    • Power supply, water supply, wastewater treatment

    • Surveillance cameras and smart camera system with AI functions

    • Environmental monitoring and lighting control

    • Integration with BIM model

  • On-site One-Stop Service Center described to coordinate investment procedures with local authorities and handle investor support through a portal

Technical infrastructure capacities

Power

  • National grid supply via 110/22 kV transformer station

  • Total capacity: 2 x 63 MVA

Water

  • Water station capacity: 15,000 m3/day and night

  • Pipeline system: D110–D400 mm

  • Water source stated: Duong River

Wastewater and drainage

  • Wastewater treatment station: 9,000 m3/day and night

  • Wastewater drainage pipe diameter: D300–D400 mm

  • Separate rainwater drainage system

  • Underground rainwater pipes: D300–D800 mm

  • Drainage principle stated: automatic drainage

Internal traffic

  • Grid layout transportation network

  • Minimum carriageway width: 10.5 m

  • Sidewalks: 6–10 m

Fire-fighting

  • Fire-fighting water system along road lines

  • Fireplug spacing: 120–150 m

  • Fire-fighting pillar diameter: D125 mm

Telecommunications

  • Modern telecommunications system stated to meet international standards

  • Domestic and international communication services positioning

Environmental and resource figures stated

  • Green trees cover: 11.15% of total land area

  • Trees described with a 60% “high-carbon sequestering” figure

  • CO2 absorption figure stated: at least 2,250 tons from the 3rd year onward

  • Solar power: expected minimum capacity around 1.5 MW

  • EV charging stations stated

  • Wastewater reuse stated at 5–25% with recirculating and irrigation reuse descriptions

Investment incentive scope stated

Import-duty incentive scope is presented under Decree No. 134/2016/ND-CP, including listed exemption categories for eligible cases such as:

  • Imported goods for the production of exported goods

  • Imported goods for processing and processed export products

  • Goods imported to create fixed assets for entities eligible for investment incentives

  • Goods imported for scientific research and technology development

  • Imported goods for environmental protection

  • Raw materials, supplies, and components for IT products, digital content, and software

  • A 5-year duty exemption scope for certain raw materials, supplies, and components not domestically manufactured, subject to stated eligibility conditions

Rental rates and service charges stated

  • Infrastructure rental: 0.9 USD/m²/year, yearly payment

  • Water price: 13,210 VND/m3, monthly payment

  • Wastewater treatment fee: 9,600 VND/m3, monthly payment

    • Quantity defined as 80% of water supply

  • Power charges by time bands

    • Normal hours: 1,833 VND/kWh

    • Night hours: 1,190 VND/kWh

    • Rush hours: 3,398 VND/kWh

Construction management parameters stated

  • Building density: 70%

  • Land using factor: 3.5 times

  • Limited height: 5 levels

  • Green density: over 20%

  • Building setback from internal roads: 6–10 m

  • Minimum distance between adjacent enterprises’ fences: 3.5 m

  • Transparent fence required along internal roads

  • Permitted buildings: production plant, warehouses, operating offices, canteens, support facilities

  • Prohibited: house building, underground exploitation building

Workforce and statutory cost references stated

  • Minimum wage region 2: 4,730,000 VND/month

  • Average salary of workers: 320–500 USD/person/month

  • Engineer/technician/office staff: 430–680 USD/month

  • Chief division/chief accountant/manager: 680–1,100 USD/month

  • Director: 1,000–3,500 USD/month

  • Total social insurance: 32% with employer and employee contribution breakdown stated

Scan the QR Code to request the full project brief, plot matching, and site visit arrangement.

For industrial park developers

Feature your project on Manufacturing.com.vn and a controlled lead handover flow. Scan the QR Code to submit your project profile.

Tell us your needs