## Project snapshot

  • Province: Thai Nguyen, Northern Vietnam

  • Total area: 296 ha

  • Operating timeline: 2024–2074

  • Land structure: Zone 1 (175 ha) and Zone 2 (121 ha)

  • Leasing model: industrial land for lease under an infrastructure-ready model

An Emerging Industrial Center in the Northern Midlands and Moutainous Region
An Emerging Industrial Center in the Northern Midlands
and Moutainous Region

## Connectivity references
Travel time references

  • Noi Bai International Airport: ~40 minutes, 45 km

  • Hanoi: ~50 minutes, 65 km

  • Hai Phong Port: ~2h20 minutes, 170 km

Distance references

  • Cai Lan Port: 200 km

  • Cat Bi Airport: 165 km

  • Gia Binh Airport: 80 km

  • Thai Nguyen city center: 10 km

Key road linkage points

  • 5 km to Hanoi–Thai Nguyen Highway via Song Cong Interchange

  • Adjacent to Ring Road No. 5, planned before 2030

## Scale and land structure

  • Zone 1: 175 ha

  • Zone 2: 121 ha

  • Master plan shows multiple land plot blocks and internal access planning

## Target investment industries

  • Electrical and electronic products

  • Telecommunications

  • Supporting industries

  • New materials

  • Clean energy industry

  • Pharmaceuticals

  • Other sectors aligned with local planning

## Investment incentive scope stated

  • Import-duty exemption categories stated for eligible cases, including:

    • Imported goods for production of exported goods

    • Goods for processing and processed export products

    • Environmental protection goods

    • Goods for scientific research and technology development

    • Goods imported to create fixed assets for eligible incentive entities

    • Exemptions for specific raw materials, supplies, and components in qualifying conditions over a defined period

## Technical infrastructure capacities

Power

  • 2x 110/22 kV power stations, total 6x63 MVA

  • 1x 110 kV power station, 50 MVA

Water

  • Water plants supply: 7,200 m³/day

  • On-site water supply station: 9,000 m³/day

Wastewater and drainage

  • Wastewater treatment station: 6,000 m³/day

  • Separate rainwater drainage system with minimum D800 mm underground pipes

  • Drainage positioning: automatic drainage design with no flooding occurs in the industrial park

Internal traffic

  • Grid layout internal road network

  • Minimum carriageway width: 10.5 m

  • Sidewalks: 4–6 m

Firefighting

  • Firefighting water system along road lines

  • Fireplug spacing: 120–150 m

Telecom

  • International-standard telecom system

  • High-speed communication and data transmission positioning

## Site conditions and environmental ratios

  • Foundation elevation: minimum 22.5 m

  • Geological positioning: hill soil

  • Green coverage: 15.79% (Zone 1) and 12.54% (Zone 2)

## Published recurring charges and planning parameters

Service and maintenance

  • Industrial service and infrastructure maintenance fee: 0.7 USD/m²/year, yearly payment

Power tariff references

  • Normal hours: 1,833 VND/kWh

  • Night hours: 1,190 VND/kWh

  • Rush hours: 3,398 VND/kWh

Construction management parameters

  • Building density: 70%

  • Land using factor: 3.5 times

  • Height limit: 5 levels

  • Green density: over 20%

  • Setbacks: at least 6 m from internal road boundary and at least 3.5 m from neighboring plot boundary (fire access)

  • Permitted: production plants, warehouses, operating offices, canteens, support facilities

  • Prohibited: housing buildings, underground exploitation buildings

## Workforce and statutory cost references

  • Minimum wage zone 2: 4,730,000 VND/person/month (182 USD/person/month)

  • Average worker salary: 300–500 USD/person/month

  • Engineer/technician/office staff: 350–640 USD/person/month

  • Manager range: 680–1,100 USD/person/month

  • Total social insurance: 32% with employer/employee contribution breakdown


Click here or Scan the QR Code to request the full project brief, land plot matching, and site visit arrangement.

## For industrial park developers
Feature your project on Manufacturing.com.vn with a data-first public article and a controlled lead handover flow. Click here or Scan the QR Code to submit your project profile.

 

Tell us your needs