## Project snapshot
Province: Thai Nguyen, Northern Vietnam
Total area: 296 ha
Operating timeline: 2024–2074
Land structure: Zone 1 (175 ha) and Zone 2 (121 ha)
Leasing model: industrial land for lease under an infrastructure-ready model

## Connectivity references
Travel time references
Noi Bai International Airport: ~40 minutes, 45 km
Hanoi: ~50 minutes, 65 km
Hai Phong Port: ~2h20 minutes, 170 km
Distance references
Cai Lan Port: 200 km
Cat Bi Airport: 165 km
Gia Binh Airport: 80 km
Thai Nguyen city center: 10 km
Key road linkage points
5 km to Hanoi–Thai Nguyen Highway via Song Cong Interchange
Adjacent to Ring Road No. 5, planned before 2030
## Scale and land structure
Zone 1: 175 ha
Zone 2: 121 ha
Master plan shows multiple land plot blocks and internal access planning
## Target investment industries
Electrical and electronic products
Telecommunications
Supporting industries
New materials
Clean energy industry
Pharmaceuticals
Other sectors aligned with local planning
## Investment incentive scope stated
Import-duty exemption categories stated for eligible cases, including:
Imported goods for production of exported goods
Goods for processing and processed export products
Environmental protection goods
Goods for scientific research and technology development
Goods imported to create fixed assets for eligible incentive entities
Exemptions for specific raw materials, supplies, and components in qualifying conditions over a defined period
## Technical infrastructure capacities
Power
2x 110/22 kV power stations, total 6x63 MVA
1x 110 kV power station, 50 MVA
Water
Water plants supply: 7,200 m³/day
On-site water supply station: 9,000 m³/day
Wastewater and drainage
Wastewater treatment station: 6,000 m³/day
Separate rainwater drainage system with minimum D800 mm underground pipes
Drainage positioning: automatic drainage design with no flooding occurs in the industrial park
Internal traffic
Grid layout internal road network
Minimum carriageway width: 10.5 m
Sidewalks: 4–6 m
Firefighting
Firefighting water system along road lines
Fireplug spacing: 120–150 m
Telecom
International-standard telecom system
High-speed communication and data transmission positioning
## Site conditions and environmental ratios
Foundation elevation: minimum 22.5 m
Geological positioning: hill soil
Green coverage: 15.79% (Zone 1) and 12.54% (Zone 2)
## Published recurring charges and planning parameters
Service and maintenance
Industrial service and infrastructure maintenance fee: 0.7 USD/m²/year, yearly payment
Power tariff references
Normal hours: 1,833 VND/kWh
Night hours: 1,190 VND/kWh
Rush hours: 3,398 VND/kWh
Construction management parameters
Building density: 70%
Land using factor: 3.5 times
Height limit: 5 levels
Green density: over 20%
Setbacks: at least 6 m from internal road boundary and at least 3.5 m from neighboring plot boundary (fire access)
Permitted: production plants, warehouses, operating offices, canteens, support facilities
Prohibited: housing buildings, underground exploitation buildings
## Workforce and statutory cost references
Minimum wage zone 2: 4,730,000 VND/person/month (182 USD/person/month)
Average worker salary: 300–500 USD/person/month
Engineer/technician/office staff: 350–640 USD/person/month
Manager range: 680–1,100 USD/person/month
Total social insurance: 32% with employer/employee contribution breakdown

## For industrial park developers
Feature your project on Manufacturing.com.vn with a data-first public article and a controlled lead handover flow. Click here or Scan the QR Code to submit your project profile.