Ready-Built Facility

RBF3 [Nghe An]: Ready-Built Factory with 12 m Clear Height Option and Highway Access in Minutes

Wednesday, 10 Dec, 2025

## Project snapshot

Location of Nghe An Province
Nghe An Province
  • Province: Nghe An, Central Vietnam

  • Development zone positioning: Dong Nam Economic Zone

  • Phase 1 land area: 15.6 ha

  • Net lease area (Phase 1): 42,264 m²

  • Product types: single-storey and double-storey ready-built factories; build-to-suit facility

  • Handover (Phase 1): Q2/2025

## Connectivity references
Highway access

  • Highway 7C: 1 min, 50 m

  • Asian Highway 1A: 5 min, 3 km

  • North-South Expressway: 5 min, 4.5 km

Seaport cluster

  • Cua Lo Seaport: 25 min, 15 km

  • Vissai Seaport: 25 min, 17 km

  • Nghi Son Seaport: 1.6 hrs, 80 km

  • Lach Huyen International Port: 5.2 hrs, 370 km

Cities and airports

  • Vinh City: 25 min, 18 km

  • Vinh International Airport: 25 min, 18 km

  • Hanoi City: 3.5 hrs, 280 km

  • Hai Phong City: 5 hrs, 355 km

  • Da Nang City: 9 hrs, 487 km

Cluster proximity references (drive)

  • Foxconn: 1 min, 50 m

  • Sunny: 2 min, 300 m

  • Goertek: 5 min, 3.5 km

  • Luxshare: 25 min, 18 km

## Phase 1 master plan components stated

The master plan
The master plan
  • 3 gates (IN/OUT and OUT)

  • Operation office

  • Sewage treatment plant

  • EV charging station

  • Garden and green belt

  • Recruitment board

  • Single-storey and double-storey factory blocks

  • Internal roads labeled ROAD 1 and ROAD 2

## Unit structure and sizing
Factory footprints stated (multiple options)

  • 45x72, 42x72, 36x72, 45x66, 42x66, 36x66 m

Office footprints stated

  • 12x9 m and 18x9 m

## Building specifications

Building specifications
Building specifications


Single-storey ready-built factory (key stated parameters)

  • Clear height: 12 m

  • Single-row column only, 36 m span

  • Column distance: 10.5–12 m

  • Floor loading: 2 tons/m²

  • Metal roof with insulation layer

  • Light penetration design

Double-storey ready-built factory (key stated parameters)

  • Clear height: 5 m and 7 m

  • Drop panel to increase clear height

  • Single-row column only, 33 m span

  • Column distance: 10.5–12 m

  • Floor loading: 2 tons/m²

  • Metal roof with insulation layer

  • Light penetration design

## Technical specifications stated
Slab

  • Conventional 180 mm slab with liquid hardener

  • Flatness: FM4

Loading bays and doors

  • Front canopy: 6 m depth, roller shutter door width 7 m per unit

  • Back canopy: 1 m depth, roller shutter door width 3.5 m per unit

Walls

  • Brick wall 1.2 m height

  • Metal cladding with translucent panel from 1.2 m to eave

Electricity

  • 550 kVA, 3-phase per unit (depending on unit size)

  • Internal electricity network: 2 single closed-loop circuits

Fire and life safety

  • Compliant with latest TCVN

  • Automatic sprinkler and smoke extraction

Security

  • 24/7 external security with AI and CCTV

## One-stop customer service stated
Investment licence support

  • Licence application support (IRC, ERC)

  • Company establishment support (seal, tax code registration)

Legal support

  • Economic, tax, and legal updates (quarterly newsletter, seminar)

  • Licence amendment support (IRC, ERC)

Operation support

  • Estate management (common security, office waste disposal, public area cleaning and landscaping)

  • Daily operation support (worker accommodation survey, salary survey)

  • Visa and resident application support

Recruitment support

  • Job fair and recruitment agency connection

  • Place for recruitment activities

## ESG and estate management positioning stated

  • Estate management services: security, cleaning and landscaping, operation and maintenance, office waste disposal

  • ESG emphasis references LEED-aligned categories: sustainable sites, water efficiency, materials and resources, indoor environmental quality, energy and atmosphere, innovation in operations and regional priority

## Tax incentives stated

  • Corporate income tax: 10% for the first 15 years

  • CIT holiday: 4 years (from arising taxable income)

  • CIT reduction: 50% for 9 subsequent years

  • Import tax: free import tax holiday for 5 years

  • Rental incentive headline stated: 0 USD of rental in first 10 years

## Nghe An manufacturing base indicators stated

  • Total area: 16,500 km²

  • Population: 3.4 million

  • Labor force: 1.6 million

  • Minimum wage: US$128

  • Universities/colleges: 20

  • Vocational training schools: 65

  • FDI value: US$4 billion

  • GDP per capita: US$1,915 (as of January 2024)

Manufacturing.com.vn recommends on-site evaluation to confirm technical suitability.
Contact us to arrange a site visit.

Tell us your needs