## Project snapshot
Province: Nghe An, Central Vietnam
Development zone positioning: Dong Nam Economic Zone
Phase 1 land area: 15.6 ha
Net lease area (Phase 1): 42,264 m²
Product types: single-storey and double-storey ready-built factories; build-to-suit facility
Handover (Phase 1): Q2/2025
## Connectivity references
Highway access
Highway 7C: 1 min, 50 m
Asian Highway 1A: 5 min, 3 km
North-South Expressway: 5 min, 4.5 km
Seaport cluster
Cua Lo Seaport: 25 min, 15 km
Vissai Seaport: 25 min, 17 km
Nghi Son Seaport: 1.6 hrs, 80 km
Lach Huyen International Port: 5.2 hrs, 370 km
Cities and airports
Vinh City: 25 min, 18 km
Vinh International Airport: 25 min, 18 km
Hanoi City: 3.5 hrs, 280 km
Hai Phong City: 5 hrs, 355 km
Da Nang City: 9 hrs, 487 km
Cluster proximity references (drive)
Foxconn: 1 min, 50 m
Sunny: 2 min, 300 m
Goertek: 5 min, 3.5 km
Luxshare: 25 min, 18 km

## Phase 1 master plan components stated

3 gates (IN/OUT and OUT)
Operation office
Sewage treatment plant
EV charging station
Garden and green belt
Recruitment board
Single-storey and double-storey factory blocks
Internal roads labeled ROAD 1 and ROAD 2
## Unit structure and sizing
Factory footprints stated (multiple options)
45x72, 42x72, 36x72, 45x66, 42x66, 36x66 m
Office footprints stated
12x9 m and 18x9 m
## Building specifications

Single-storey ready-built factory (key stated parameters)
Clear height: 12 m
Single-row column only, 36 m span
Column distance: 10.5–12 m
Floor loading: 2 tons/m²
Metal roof with insulation layer
Light penetration design
Double-storey ready-built factory (key stated parameters)
Clear height: 5 m and 7 m
Drop panel to increase clear height
Single-row column only, 33 m span
Column distance: 10.5–12 m
Floor loading: 2 tons/m²
Metal roof with insulation layer
Light penetration design
## Technical specifications stated
Slab
Conventional 180 mm slab with liquid hardener
Flatness: FM4
Loading bays and doors
Front canopy: 6 m depth, roller shutter door width 7 m per unit
Back canopy: 1 m depth, roller shutter door width 3.5 m per unit
Walls
Brick wall 1.2 m height
Metal cladding with translucent panel from 1.2 m to eave
Electricity
550 kVA, 3-phase per unit (depending on unit size)
Internal electricity network: 2 single closed-loop circuits
Fire and life safety
Compliant with latest TCVN
Automatic sprinkler and smoke extraction
Security
24/7 external security with AI and CCTV
## One-stop customer service stated
Investment licence support
Licence application support (IRC, ERC)
Company establishment support (seal, tax code registration)
Legal support
Economic, tax, and legal updates (quarterly newsletter, seminar)
Licence amendment support (IRC, ERC)
Operation support
Estate management (common security, office waste disposal, public area cleaning and landscaping)
Daily operation support (worker accommodation survey, salary survey)
Visa and resident application support
Recruitment support
Job fair and recruitment agency connection
Place for recruitment activities
## ESG and estate management positioning stated
Estate management services: security, cleaning and landscaping, operation and maintenance, office waste disposal
ESG emphasis references LEED-aligned categories: sustainable sites, water efficiency, materials and resources, indoor environmental quality, energy and atmosphere, innovation in operations and regional priority
## Tax incentives stated
Corporate income tax: 10% for the first 15 years
CIT holiday: 4 years (from arising taxable income)
CIT reduction: 50% for 9 subsequent years
Import tax: free import tax holiday for 5 years
Rental incentive headline stated: 0 USD of rental in first 10 years
## Nghe An manufacturing base indicators stated
Total area: 16,500 km²
Population: 3.4 million
Labor force: 1.6 million
Minimum wage: US$128
Universities/colleges: 20
Vocational training schools: 65
FDI value: US$4 billion
GDP per capita: US$1,915 (as of January 2024)
Manufacturing.com.vn recommends on-site evaluation to confirm technical suitability.